China-Laos Railway completes cross-border tunnel
Share - WeChat
[Video/Yao Wei, Chen Chang and Wang Yufei]
The cross-border tunnel on the China-Laos Railway was completed on Sunday, laying a solid foundation for the full operation of the whole line.
Dubbed as the "friendship tunnel," it covers a total length of 9.59 kilometers, with 7.17 kilometers on the Chinese side and 2.42 kilometers on the Lao section.
Using China's technical standards and equipment, the China-Laos Railway measures more than 1,000 kilometers from Kunming, Southwest China's Yunnan province, to Vientiane, capital of Laos. The project is scheduled to be completed and opened to traffic at the end of 2021 and will cut the travel time between Kunming and Vientiane to 12 hours.
- Chinese scientists achieve breakthrough in precise protein degradation
- Chinese researchers develop blink-powered eye-tracking device to help paralyzed patients control wheelchairs
- China's commercial crewed spacecraft test capsule completes land-buffering verification
- China's job market stable in 2025 with 5.2% surveyed urban unemployment rate
- Kyz Kuu (Kazakh equestrian)
- Atlas Silk
































