<tt id="6hsgl"><pre id="6hsgl"><pre id="6hsgl"></pre></pre></tt>
          <nav id="6hsgl"><th id="6hsgl"></th></nav>
          国产免费网站看v片元遮挡,一亚洲一区二区中文字幕,波多野结衣一区二区免费视频,天天色综网,久久综合给合久久狠狠狠,男人的天堂av一二三区,午夜福利看片在线观看,亚洲中文字幕在线无码一区二区
             
            home feedback about us  
             
          CHINAGATE.WEST DEVELOPMENT.infrastructure    
              Key Issues  
           
            Sustainable development & environment  
            Industrial restructuring  
            Infrastructure  
            Market mechanism  
            Capital market  
            High-tech  
            Education & HR  
            Overseas Investment  
            Minority prosperity  
            East-west cooperation  
            Agriculture  
            Travel  
           
           
                 
                 
                 
               
                 
                 
                 
                 
           
           
           
          Three Gorges Dam begins to fill on schedule


          2003-06-02
          China Daily

          China's Three Gorges Dam began to fill as its sluice gates started closing from 9 am on June 1.

          The sluice gates at the dam in Yichang, Central China's Hubei Province, have begun blocking the flood-prone Yangtze River to form what will become a huge 600-kilometer-long reservoir.

          The water level will rise from the current 100 meters to 135 meters by June 15. The water levels behind the dam will by then be 65 meters higher than those of the river downstream, laying the foundation for hydro-electric power generation.

          The storing of water in the dam is a milestone in the development of the world's largest hydropower project, which will be completed in 2009.

          Navigation on the Three Gorges section of the Yangtze River, which was prohibited for 52 days, will resume on June 16 as the permanent ship lock at the middle reaches of the Yangtze River begins trial operations. Larger ships will be able to traverse the dam to the river upstream.

          Since construction began on the project in 1993, the multi-billion-dollar scheme has progressed on schedule, with phase two due for completion by the end of this year.

          And two hydropower generating units, each with a capacity of 700,000 kilowatts, will start up in August. Another two will begin operating in October.

          A total of 5.5 billion kilowatt-hours of electricity will be produced this year by the project.

          The power will be delivered to energy-starved cities in Central and East China this year, including Shanghai and Wuhan, said Lu Youmei, president of the China Three Gorges Project Corp (CTGCC), which owns and is developing the scheme.

          The project is due for completion in six years. Over the six years, the dam water level is expected to reach 175 meters and another 12 power generators will start work. By 2009, 26 power generating units will have a total capacity of 18.2 million kilowatts.

          Lu said the project could come within its budget of 203.5 billion yuan (US$24.57 billion).

           

           
             
           
          home feedback about us  
            Produced by www.ming7.cn. All Rights Reserved
          E-mail: webmaster@chinagate.com.cn
          主站蜘蛛池模板: 日韩高清福利视频在线观看| 丰满人妻一区二区三区无码AV| 日韩人妻无码精品久久| 亚洲一区黄色| 日日碰狠狠添天天爽五月婷| 无码午夜人妻一区二区三区不卡视频 | 亚洲中文日韩一区二区三区| 亚洲人成无码网站18禁| 亚洲码国产精品高潮在线| 欧美国产日产一区二区| 狠狠色狠狠综合久久| 国产精品98视频全部国产| 国产精品国产高清国产av| 国产精品69人妻我爱绿帽子| 米奇亚洲国产精品思久久| 亚洲码和欧洲码一二三四| 亚洲69视频| 亚洲中文一区二区av| 久久青草热| 青青草原亚洲| 国产精品一在线观看| 久久亚洲国产成人亚| 蜜臀av午夜精品福利| 无码综合天天久久综合网| 国产最大的福利精品自拍| 中文国产不卡一区二区| 亚洲精品日韩中文字幕| 国产L精品国产亚洲区在线观看 | 尹人香蕉久久99天天拍| 蜜桃久久精品成人无码av| 亚洲国产性夜夜综合| 久久久www成人免费毛片| 久久国产福利国产秒拍| 57pao国产成视频免费播放| 国产无码高清视频不卡 | 少妇肉欲系列1000篇| 久久国产精品老女人| 久久国产一区二区日韩av| 国产精品一区二区人人爽| 2021国产精品视频网站| 国产性生大片免费观看性|