<tt id="6hsgl"><pre id="6hsgl"><pre id="6hsgl"></pre></pre></tt>
          <nav id="6hsgl"><th id="6hsgl"></th></nav>
          国产免费网站看v片元遮挡,一亚洲一区二区中文字幕,波多野结衣一区二区免费视频,天天色综网,久久综合给合久久狠狠狠,男人的天堂av一二三区,午夜福利看片在线观看,亚洲中文字幕在线无码一区二区
          OLYMPICS / center

          Facts and figures

          Xinhua
          Updated: 2008-08-08 21:50

           

          BEIJING -- The 29th summer Olympic Games opened in Beijing on Friday night. The following are some facts and figures about the opening ceremony.

          THE VENUE

          The opening was held in the National Stadium, also known as the Bird's Nest, in the Olympic Green in northern Beijing.

          The stadium was jointly designed by Herzog & de Meuron Design Office, and China Architecture Design & Research Group and ARUP. Its construction began on December 24, 2003, and completed on June 30, 2008. Altogether 45,000 tonnes of steel was used to build its framework.

          The stadium's seating capacity is 91,000, including 11,000 temporary seats. The floor space is 258,000 square meters.

          GROUND FACILITIES

          A major elevating platform at the center is 20 meters in diameter, weighing about 400 tonnes, and can reach 11.4 meters high at a speed of zero to 12 meters per minute.

          Two moving lids on the stage serve as a roof.

          A 36 by 22 meters LED screen is installed on the plates.

          On the south and north sides are 30 complementary platforms, with each 3-meter-wide and 3-meter-long.

          When the two lids move toward the center, the complementary platforms will rise and make up the stage.

          Two sets of 22-meter-long LED scroll painting were installed, with a diameter of 22 meters.

          With LED images shown on it, the scroll painting can stretch 147 meters long.

          ABOVE-STAGE FACILITIES

          Ten steel ropes are hung above the stage, weighing 40 tonnes in all and with a total length of 55 kilometers.

          Among the 31 wire devices, 16 sets can carry a load of 300 kilograms each, with a load of 100 kilograms for each of the other 15. All can move at 3 meters per second and can function at the same time.

          One hundred jumping facilities with a load capacity of 80 kilograms each are set under the rim of the roof edge, which can move at 3 meters per second and be operated simultaneously.

          LED SCREEN ON THE GROUND

          A 147 by 22 meters LED screen is laid at the center. Approximately 44,000 colorful LED beads are embedded with a distance of 600 millimeters between each two.

          FIREWORKS CELEBRATION

          -- 287 points on the top of National Stadium

          -- 27 positions in the central area of National Stadium

          -- 12 positions in the Olympic Green

          -- 29 positions on the axis of the city

          -- 4 places in other urban areas

          MUSIC

          A total of 110 minutes of music was created by 18 composers for the opening ceremony.

          LIGHTING

          Altogether 2,583 special lights are used and lighting equipment weighing more than 300 tonnes has been installed. Electricity load for lighting totals 6,440 kilowatt.

          COSTUMES

          A total of 15,153 sets of costumes in 47 styles.

          REHEARSAL

          Some performances have been rehearsed for 13 months. Volunteers began their first mass rehearsal in March 2008.

          Comments of the article(total ) Print This Article E-mail
          主站蜘蛛池模板: 在线免费播放av日韩| 婷婷色香五月综合缴缴情香蕉| 欧美18videosex性欧美tube1080 | 老外女人毛黑p大| 国产精品一线天在线播放| 在线无码免费看黄网站| a男人的天堂久久a毛片| 免费人成在线观看成人片| 欧美孕妇变态重口另类| 国产成人a在线观看视频免费| 黑人玩弄人妻中文在线| 国产成人亚洲一区二区三区| 亚洲中文日韩一区二区三区| 日韩毛片在线视频x| 亚洲高清乱码午夜电影网| 天堂视频一区二区免费在线观看| 亚洲精品日韩久久精品| 99热在线只有精品| 国产精品视频一区不卡| 亚洲国产另类久久久精品小说| 国模一区二区三区私拍视频| 一区二区三区无码免费看| 色综合天天综合网中文伊| 成人免费无遮挡无码黄漫视频| 久久96热在精品国产高清| 国产高潮刺激叫喊视频| 国产亚洲精品综合一区| 又爽又黄又无遮掩的免费视频| 99久久精品久久久| 日韩人妻无码精品久久| 久久亚洲精品11p| 亚洲欧洲一区二区精品| 浮力影院欧美三级日本三级| 国产不卡的一区二区三区| 国产乱子伦手机在线| 精品嫩模福利一区二区蜜臀| 日本污视频在线观看| 日韩在线一区二区每天更新| 少妇爽到呻吟的视频| 天天噜噜日日久久综合网| 午夜毛片不卡免费观看视频|