          Updated: 2013-06-25

          Power and New Energy Development

          By the end of 2012, the installed capacity of electric power in China reached 1,144,910 MW, of which hydropower constituting 21.7 percent, or 248,900 MW (20,310 MW from pumped storage), thermal power 71.5 percent, or 819,170 MW (758,110 MW from coal-fired plants, 38,270 from gas-fired plants), nuclear power at 12,570 MW, grid-connected wind power, 60,830 MW, and grid-connected solar power, 3,280 MW.

          POWERCHINA is the recognized authority in China in terms of the management of technologies in hydropower, wind power and solar power and an authoritative institution for technologies in thermal power and power transmission and transformation, with more than 20,000 professionals working in the fields of planning, investigation, design, consultation and research of hydropower, water resource, thermal power, and power transformation and transmission projects.

          POWERCHINA has completed or is conducting studies and planning on more than 80 percent of China's hydropower projects and more than 50 percent of its wind farm projects.

          The installed capacity of POWERCHINA-designed hydropower plants accounts for 70 percent of the nation’s total. The total installed capacity of hydropower stations currently at the planning and design stage is above 140,000MW. POWERCHINA has undertaken safety appraisal for 70 percent of the total number of hydropower stations in China. POWERCHINA has also made designs for thermal power project with a total installed capacity of 310,000 MW; and a total of 400,000 kilometers of 220kV or higher transmission lines; and 220kV or higher substations with a total capacity of 903 million kVA. POWERCHINA has also provided consulting services for 60 percent of China's wind farms.

          POWERCHINA is at the highest level in water conservation projects in China, and?act as?a major force in river harnessing and hydropower development. POWERCHINA has built more than 100 gigantic hydropower plants, including the one at the Three-Gorges on the Yangtze River, the Xiluodu and Xiangjiaba on the Jinsha River, and the Xiaowan on the Lancang River. The capacity of POWERCHINA-built hydropower plants accounts for more than 70 percent of the nation’s total and that of plants under construction exceeds 50,000 MW.

          POWERCHINA has accumulated rich experience in installation of various generating units and equipments for thermal power, wind power, gas power generation, solar power, and nuclear power, and power transmission and distribution projects and has built thermal-power generating units with a total capacity of 399,000MW (48.7 percent of the nation’s total), 31,700 km of 110kV- or higher transmission lines (some still under construction), 780 substations and converter stations of 110 kV or higher, and more than 6,000 wind turbine generating systems of various types. POWERCHINA has also undertaken China’s first biomass power generating project and a number of solar power projects.

          POWERCHINA has carried out many scientific researches in the fields of hydro power, thermal power, wind power and new energy resource. It has played a crucial role in development of technical standards for China’s hydropower and wind power industries and formulated many technical standards for thermal power and power transformation and transmission. It is a world leader in high/low pressure thermal power plants, air-cooled generator units, UHVAC-DC power transmission and transformation, ancillary works for nuclear power , natural gas, shale gas, garbage power, solar power, wind power, biomass power, geo-thermal power and distributed energy equipment, and has been entrusted by the National Energy Administration to review designs of hydropower projects with an installed capacity of more than 250 MW and wind and solar power projects with an installed capacity of 50 MW or higher.

          POWERCHINA has had its member companies involved in nuclear power construction projects quite early. They completed the installation work for the Daya Bay Nuclear Power Plant (China's first) and the installation of island of the Ling’ao Nuclear Power Plant. A number of the member companies are qualified for work on nuclear pressure retaining components and have taken part in construction of 27 nuclear power projects. They are fully competent to installation work of conventional island of nuclear power projects as well as installation work of BOP.

          Infrastructure

          POWERCHINA has worked on highways, railways, urban rail transit systems, airport terminals and runways, water projects and housing all over the world, in various ways, such as construction, procurement and construction (PC), engineer - procure + construct (EPC), build - operate - transfer (BOT), and build - transfer (BT).

          Equipment manufacturing

          POWERCHINA produces many types of products with their own characteristics, for example: hydraulic steel gates that are used all over the world in water resource and hydropower projects for flood and flow control at intakes; boiler feed pumps, fans, and coal mills in extensive use at thermal power plants throughout the world; stacker-reclaimers, ship loaders, un-loaders and wagon tippers used at ports and harbors at home and abroad; docks, power plants, steel works, chemical plants, and cement factories; electric power fittings, steel towers, switchgears, transformers, and utility poles for power transmission projects; special vehicles for railway and highway construction sites and for the mining, metallurgy, and chemical industries and at harbors and docks; welding materials for the power and petrochemical industries, ship-building, airports, bridges and machine manufacturing; and pre-stressed concrete cylinder pipes with US technology for water resource and public works.

           

          主站蜘蛛池模板: 久久人妻精品大屁股一区| 欧美另类图区清纯亚洲| 亚洲国产成人精品女人久| 国产成人无码AV片在线观看不卡| 影视先锋av资源噜噜| 国产在线精品第一区二区| 国产精品亚洲成在人线| 欧美大胆老熟妇乱子伦视频| 国产精品一区二区av交换| 蜜臀av日韩精品一区二区| 国产99视频精品免费视频6| 97se亚洲综合自在线| 日韩放荡少妇无码视频| 97精品久久久大香线焦| 亚洲精品一区二区美女| 少妇自慰流白口浆21p| 国产精品成人午夜久久| 麻豆高清免费国产一区| 黄瓜一区二区三区自拍视频| 一区二区三区四区五区自拍| 美女内射福利大全在线看| www欧美在线观看| 99久久激情国产精品| 一区二区中文字幕视频| 国产高潮又爽又刺激的视频| 好男人好资源WWW社区| 天堂va蜜桃一区二区三区| 日本阿v片在线播放免费| 欧洲熟妇精品视频| 精品国产成人午夜福利| 国产无套乱子伦精彩是白视频| 91蜜臀国产自产在线观看| 成人免费xxxxx在线观看| 日韩精品成人区中文字幕| 吉川爱美一区二区三区视频| 一区二区三区AV波多野结衣| 无码日韩精品91超碰| 欧美视频网站www色| 人妻少妇精品久久| 国产自在自线午夜精品视频| 一卡2卡三卡4卡免费网站|