          Investment

          POWERCHINA's investment covers hydropower, wind power, thermal power, solar power, waterworks, etc.more

          Hydropower

          Updated: 2013-06-27

          POWERCHINA has funded a number of power projects, such as the Heihetang, Shuanghe, Qinglong, Sichuan Leshan Shawan, Yadu, Liuping, Dajinping, Hongyi, and Maoergai hydropower stations, and Gansu Huating Thermal Power Plant, and holds shares of Yellow River Suzhi, Meiguhe Liuhong, Bailongjiang River Zilanba hydropower stations. The total installed capacity of POWERCHINA’s hydropower investment is 107,10 MW,among which 3570 MW is available for use, 1590 MW under construction; and 5550 MW at the preliminary study stage.

          Hydropower

          Hunan Taoyuan Hydropower Station, with a total installed capacity of 180 MW and an estimated total investment of 2.69 billion RMB, is under construction. The project gained governmental approval in August 2010. The first cofferdam was enclosed on Nov 17, 2012, and the second cofferdam on Oct 2, 2012. The first generator unit will be put into production in 2013.

          Hydropower

          The Heihetang Hydropower Station, on the lower reaches of the Heihe River, a primary tributary of the Baishuijiang River, in Sichuan province, has two units with a total installed capacity of 80 MW. The entire project is put on line in December 2006.

          Hydropower

          The Shuanghe Hydropower Station, on the upper reaches of the Baishuijian River, Sichuan Province, has three units and a total installed capacity of 81 MW. The entire project was put on line in June 2009.

          Hydropower

          The Qinglong Hydropower Station, on the main stream of the Baishui River, Sichuan Province, has three units and a total installed capacity of 102 MW. The entire project was put on line in July 2012.

          Hydropower

          The Nuozu Hydropower Station, on the middle reaches of the Nanpanjiang River’s main stream, has an installed capacity of 3 × 25 MW. The construction work began in December 2005; and the entire project was put on line in July 2009.

          Hydropower

          The Fenghuanggu Hydropower Station, on the lower reaches of the Nanpanjiang River, has a total installed capacity of 100 MW. The project was put on line in July 2009.

          主站蜘蛛池模板: 部精品久久久久久久久| 日韩美女av二区三区四区| 国产9 9在线 | 免费| 国产视频一区二区在线看| 少妇被无套内谢免费看| 国产高颜值极品嫩模视频| 国产美女在线精品亚洲二区| 亚洲国产性夜夜综合| 黄色三级亚洲男人的天堂| 在线观看无码不卡av| 中文字幕无码久久一区| 精品国产一区二区三区在线观看 | 免费观看欧美猛交视频黑人| 免费一区二三区三区蜜桃| 不卡一区二区三区在线视频| 久久精品国产成人午夜福利| 成人精品网一区二区三区| 国产午夜在线观看视频播放| 妺妺窝人体色www看美女| 国产三级精品片| 天堂网亚洲综合在线| 丰满人妻一区二区乱码中文电影网| 激情综合色综合久久丁香| 人妻中文字幕精品一页| 青青草无码免费一二三区| 在线观看91精品国产不卡| 亚洲精品综合网中文字幕| 漂亮人妻被修理工侵犯| 国产3p露脸普通话对白| 国产麻豆精品一区一区三区| 有码中文字幕一区三区 | 99在线视频免费| 精品亚洲国产成人av在线| 日韩精品区一区二区三vr| 91精品免费久久久| 国产亚洲精品一区二区不卡| 久久综合给合久久狠狠97色| 国产黄色精品高潮播放| 中文国产人精品久久蜜桃| 国产精品久久久久久影视| 欧美专区日韩视频人妻|