<tt id="6hsgl"><pre id="6hsgl"><pre id="6hsgl"></pre></pre></tt>
          <nav id="6hsgl"><th id="6hsgl"></th></nav>
          国产免费网站看v片元遮挡,一亚洲一区二区中文字幕,波多野结衣一区二区免费视频,天天色综网,久久综合给合久久狠狠狠,男人的天堂av一二三区,午夜福利看片在线观看,亚洲中文字幕在线无码一区二区
                   |Home|About Hebei|Government|Business|Opening up|Travel|Culture| Site Search 中文
          Integrated development projects in Hebei call for bids
          2010-07-26

          43. Fuyang River Main City Section River Bank Aisle Comprehensive Development Project in Handan City

          Ⅰ. The Project Content

          The project is to the north of Nanhu Park and to the south of Menghu Lake senic apot. The area is 16 kilometers long, and covers the land area of 15 square kilometers. Take the advantages of the unique and superior water envirenment and green space corridor of Fuyang River, the project is planned to explore the deep historical and cultural details of Fuyang River and pump new development idea, to establish elaborate river bank aisle. Along the river eight gates, nine gardens and twenty eight bridges will be constructed as infrastructural facilities. While building 3 zones (River Bank Sightseeing Zone, Business Leisure Pedestrian Zone, and Ecologic Experience Tourism Zone) and 3 centers (Centeral River Bank Leisure Business Area, Hanshan Cultural Leisure Business Area and Congtai Tourism Leisure Business Area), the project is planed to build a city sightseeing zone with multifunction for tourism, laisure, amusement, business, and residence. This project enjoys urban redevelopment preferential policy and key project supporting preferential policy of Handan government.

          Ⅱ. Investment Estimate

          The total investment is 3216.37 million dollars.

          III. Construction Conditions

          The river bank area is the golden district of the city. There are abundant labour power, material and capital in the area. Old town and villages in the city of the area are under reconstruction plan, and part of the reconstruction has already started. All the factories in the area is under the" suppress the second industry and develop the third industry " project of Handan City. Some of the factories have begun to move out. Treatment of watercourse is mostly finished. Preliminary plan and design of the project is completed. The infrastructural facilities around the area including roads, water sulppy, electric supply and system of drains are all in readiness.

          VI.Cooperation Mode

          Cooperation, joint venture and Sole venture are all welcomed.

          V.Liaison

          Contact Person: Zhao Jianbin, Handan Construction Bureau Tel:86-310-3122916,3122944 Fax:86-310-3022329 Email:zjb@hdjsj.hd.gov.cn Address:No.2 South Exhibition Road Handan City P.C.056002

          44. Hedong Village Reconstruction Project in Handan City

          Ⅰ. The Project Content

          The village is in the range of the reconstruction project of the 55 villages in the city within the ring road. There are 3800 residents, 927 households in the area. The planned land area is 500 Mu. In 2010 Handan government takes Hedong village into reconstruction list, and offers favorable policies. The construction will be implemented according to The Implementation instruction on accelerating the old town and inner-city village reconstruction in the main city ([2009] No. 39) of the municipal government. Land grand fee will follow a policy of"separating revenue from expenditures", and the land price and deed tax can be paid in three times within three months, after deducting related fees, will be returned charged to property owner by the finance charge as the removal and rebuilding resettlement compensation. At the same time the project exempt from government funding and administrative fees such as land management fees, urban infrastructure supporting fees, house ownership registration fees, urban road occupation excavation costs and special funds of new wall materials etc.; Exempt from construction waste and sediment handling fees; for the construction of civil air defense according to the provisions the basement of ex-situ construction costs is free, due to geology, terrain and planning reasons not to build air-defense basement, remit half of the civil air defense construction fee; for the transfer condition that allocated by the municipal government to build low-rent housing at cost price of the acquisition is no longer to extract the low-rent housing security funds.

          Ⅱ. Investment Estimate and Financing

          The total investment is 58.48 million dollars. No limitation for proportion of foreign tradesman investment.

          III. Market Analysis

          Current price of the Handan City real estate market is steady and rising. Commercial residecial house sale is promising, with strong market potential.

          VI.Construction Conditions

          The village is located in the city center within the ring road. The transportation is convenient, and infrastructure and supporting facilities are completed.

          V.Benefit Analysis

          The village is located in central area within the ring road. Through the comprehensive development of real estate, the project enjoys the preferential policies. There is great development space for profit margins.

          VI.Cooperation Mode

          Cooperation, joint venture and sole venture, by developing to promote the construction.

          VII.Liaison

          Contact Person: Zhai Yongsheng, Handan Construction Bureau Address:No.2 South Exhibition Road Handan City P.C.056002 Tel:86-310-3100126,3100121 Fax:86-310-3022329

          45. Hexi Village Reconstruction Project in Handan City

          Ⅰ. The Project Content

          The village is in the range of the reconstruction project of the 55 inner city villages within the ring road. There are 3100 residents belong to 840 households in the area. The planned land area is 318mu. In 2010 Handan government takes Hedong village into reconstruction list, and offers favorable policies. The construction will be implemented according to The Implementation instruction on accelerating the old town and inner-city village reconstruction in the main city ([2009] No. 39) of the municipal government. Land grand fee will follow a policy of"separating revenue from expenditures", and the land price and deed tax can be paid in three times within three months, after deducting related fees, will be returned charged to property owner by the finance charge as the removal and rebuilding resettlement compensation. At the same time the project exempt from government funding and administrative fees such as land management fees, urban infrastructure supporting fees, house ownership registration fees, urban road occupation excavation costs and special funds of new wall materials etc.; Exempt from construction waste and sediment handling fees; for the construction of civil air defense according to the provisions the basement of ex-situ construction costs is free, due to geology, terrain and planning reasons not to build air-defense basement, remit half of the civil air defense construction fee; for the transfer condition that allocated by the municipal government to build low-rent housing at cost price of the acquisition is no longer to extract the low-rent housing security funds.

          Ⅱ. Investment Estimate and Financing

          The total investment is 58.48 million dollars. No limitation for proportion of foreign tradesman investment.

           III. Market Analysis

          Current price of the Handan City real estate market is steady and rising. Commercial residecial house sale is promising, with strong market potential.

          VI.Construction Conditions

          The village is located in the city center within the ring road. The transportation is convenient, and infrastructure and supporting facilities are completed.

          V.Benefit Analysis

          The village is located in central area within the ring road. Through the comprehensive development of real estate, the project enjoys the preferential policies. There is great development space for profit margins.

          VI.Cooperation Mode

          Cooperation, joint venture and sole venture, by developing to promote the construction.

          VII.Liaison

          Contact Person: Zhai Yongsheng, Handan Construction Bureau Address:No.2 South Exhibition Road Handan City P.C.056002 Tel:86-310-3100126,3100121 Fax:86-310-3022329





           
          About Hebei  
          More
          Opening Up  
          More
          Culture  
          More
          Hot Topics  
          More
          Info   Special

          Zhongmao Haiyue Hotel
           
          Copyright 2009 Hebei China All Rights Reserved
           
          The Official Website of the Hebei Government
          Sponsored by Hebei Provincial Government
          Constructed by Chinadaily.com.cn
          主站蜘蛛池模板: 亚洲一区二区中文av| 日本九州不卡久久精品一区| 图片区偷拍区小说区五月| 欧美18videosex性欧美tube| 亚洲日韩精品无码一区二区三区 | 亚洲一区二区三区在线播放无码| 国产偷国产偷亚洲清高APP| 免费看又黄又无码的网站| 肉大捧一进一出免费视频| 亚韩精品中文字幕无码视频| 亚洲大老师中文字幕久热| 国产综合久久久久久鬼色| 四虎在线成人免费观看| 九九久久精品国产免费看小说 | 国产精品亚洲国际在线看| 中国小帅男男 gay xnxx| 91精品午夜福利在线观看| 爆乳女仆高潮在线观看| 在线观看免费人成视频色| 久久精品国产99久久无毒不卡| 日韩亚洲欧美中文高清在线| 一区二区国产高清视频在线| 国产精品免费激情视频| 亚洲最大成人在线播放| 成 人 a v免费视频在线观看| 亚洲一区二区精品动漫| 国产成人一区二区三区久久精品| 亚洲综合视频一区二区三区| 国产日韩综合av在线| 亚洲丰满老熟女激情av| 精品在线观看视频二区| 国产精品午夜福利在线观看| 国产在线观看码高清视频| 亚洲欧洲av一区二区久久| 国语自产精品视频在线看| 久久精品国产亚洲av高清蜜臀| 亚洲熟妇自偷自拍另类 | 亚洲中文字幕综合网在线| 久久天天躁综合夜夜黑人鲁色| 人妻熟妇乱又伦精品视频中文字幕| 九九久久人妻精品一区色|