<tt id="6hsgl"><pre id="6hsgl"><pre id="6hsgl"></pre></pre></tt>
          <nav id="6hsgl"><th id="6hsgl"></th></nav>
          国产免费网站看v片元遮挡,一亚洲一区二区中文字幕,波多野结衣一区二区免费视频,天天色综网,久久综合给合久久狠狠狠,男人的天堂av一二三区,午夜福利看片在线观看,亚洲中文字幕在线无码一区二区
                   |Home|About Hebei|Government|Business|Opening up|Travel|Culture| Site Search 中文
          Integrated development projects in Hebei call for bids
          2010-07-26

          43. Fuyang River Main City Section River Bank Aisle Comprehensive Development Project in Handan City

          Ⅰ. The Project Content

          The project is to the north of Nanhu Park and to the south of Menghu Lake senic apot. The area is 16 kilometers long, and covers the land area of 15 square kilometers. Take the advantages of the unique and superior water envirenment and green space corridor of Fuyang River, the project is planned to explore the deep historical and cultural details of Fuyang River and pump new development idea, to establish elaborate river bank aisle. Along the river eight gates, nine gardens and twenty eight bridges will be constructed as infrastructural facilities. While building 3 zones (River Bank Sightseeing Zone, Business Leisure Pedestrian Zone, and Ecologic Experience Tourism Zone) and 3 centers (Centeral River Bank Leisure Business Area, Hanshan Cultural Leisure Business Area and Congtai Tourism Leisure Business Area), the project is planed to build a city sightseeing zone with multifunction for tourism, laisure, amusement, business, and residence. This project enjoys urban redevelopment preferential policy and key project supporting preferential policy of Handan government.

          Ⅱ. Investment Estimate

          The total investment is 3216.37 million dollars.

          III. Construction Conditions

          The river bank area is the golden district of the city. There are abundant labour power, material and capital in the area. Old town and villages in the city of the area are under reconstruction plan, and part of the reconstruction has already started. All the factories in the area is under the" suppress the second industry and develop the third industry " project of Handan City. Some of the factories have begun to move out. Treatment of watercourse is mostly finished. Preliminary plan and design of the project is completed. The infrastructural facilities around the area including roads, water sulppy, electric supply and system of drains are all in readiness.

          VI.Cooperation Mode

          Cooperation, joint venture and Sole venture are all welcomed.

          V.Liaison

          Contact Person: Zhao Jianbin, Handan Construction Bureau Tel:86-310-3122916,3122944 Fax:86-310-3022329 Email:zjb@hdjsj.hd.gov.cn Address:No.2 South Exhibition Road Handan City P.C.056002

          44. Hedong Village Reconstruction Project in Handan City

          Ⅰ. The Project Content

          The village is in the range of the reconstruction project of the 55 villages in the city within the ring road. There are 3800 residents, 927 households in the area. The planned land area is 500 Mu. In 2010 Handan government takes Hedong village into reconstruction list, and offers favorable policies. The construction will be implemented according to The Implementation instruction on accelerating the old town and inner-city village reconstruction in the main city ([2009] No. 39) of the municipal government. Land grand fee will follow a policy of"separating revenue from expenditures", and the land price and deed tax can be paid in three times within three months, after deducting related fees, will be returned charged to property owner by the finance charge as the removal and rebuilding resettlement compensation. At the same time the project exempt from government funding and administrative fees such as land management fees, urban infrastructure supporting fees, house ownership registration fees, urban road occupation excavation costs and special funds of new wall materials etc.; Exempt from construction waste and sediment handling fees; for the construction of civil air defense according to the provisions the basement of ex-situ construction costs is free, due to geology, terrain and planning reasons not to build air-defense basement, remit half of the civil air defense construction fee; for the transfer condition that allocated by the municipal government to build low-rent housing at cost price of the acquisition is no longer to extract the low-rent housing security funds.

          Ⅱ. Investment Estimate and Financing

          The total investment is 58.48 million dollars. No limitation for proportion of foreign tradesman investment.

          III. Market Analysis

          Current price of the Handan City real estate market is steady and rising. Commercial residecial house sale is promising, with strong market potential.

          VI.Construction Conditions

          The village is located in the city center within the ring road. The transportation is convenient, and infrastructure and supporting facilities are completed.

          V.Benefit Analysis

          The village is located in central area within the ring road. Through the comprehensive development of real estate, the project enjoys the preferential policies. There is great development space for profit margins.

          VI.Cooperation Mode

          Cooperation, joint venture and sole venture, by developing to promote the construction.

          VII.Liaison

          Contact Person: Zhai Yongsheng, Handan Construction Bureau Address:No.2 South Exhibition Road Handan City P.C.056002 Tel:86-310-3100126,3100121 Fax:86-310-3022329

          45. Hexi Village Reconstruction Project in Handan City

          Ⅰ. The Project Content

          The village is in the range of the reconstruction project of the 55 inner city villages within the ring road. There are 3100 residents belong to 840 households in the area. The planned land area is 318mu. In 2010 Handan government takes Hedong village into reconstruction list, and offers favorable policies. The construction will be implemented according to The Implementation instruction on accelerating the old town and inner-city village reconstruction in the main city ([2009] No. 39) of the municipal government. Land grand fee will follow a policy of"separating revenue from expenditures", and the land price and deed tax can be paid in three times within three months, after deducting related fees, will be returned charged to property owner by the finance charge as the removal and rebuilding resettlement compensation. At the same time the project exempt from government funding and administrative fees such as land management fees, urban infrastructure supporting fees, house ownership registration fees, urban road occupation excavation costs and special funds of new wall materials etc.; Exempt from construction waste and sediment handling fees; for the construction of civil air defense according to the provisions the basement of ex-situ construction costs is free, due to geology, terrain and planning reasons not to build air-defense basement, remit half of the civil air defense construction fee; for the transfer condition that allocated by the municipal government to build low-rent housing at cost price of the acquisition is no longer to extract the low-rent housing security funds.

          Ⅱ. Investment Estimate and Financing

          The total investment is 58.48 million dollars. No limitation for proportion of foreign tradesman investment.

           III. Market Analysis

          Current price of the Handan City real estate market is steady and rising. Commercial residecial house sale is promising, with strong market potential.

          VI.Construction Conditions

          The village is located in the city center within the ring road. The transportation is convenient, and infrastructure and supporting facilities are completed.

          V.Benefit Analysis

          The village is located in central area within the ring road. Through the comprehensive development of real estate, the project enjoys the preferential policies. There is great development space for profit margins.

          VI.Cooperation Mode

          Cooperation, joint venture and sole venture, by developing to promote the construction.

          VII.Liaison

          Contact Person: Zhai Yongsheng, Handan Construction Bureau Address:No.2 South Exhibition Road Handan City P.C.056002 Tel:86-310-3100126,3100121 Fax:86-310-3022329





           
          About Hebei  
          More
          Opening Up  
          More
          Culture  
          More
          Hot Topics  
          More
          Info   Special

          Zhongmao Haiyue Hotel
           
          Copyright 2009 Hebei China All Rights Reserved
           
          The Official Website of the Hebei Government
          Sponsored by Hebei Provincial Government
          Constructed by Chinadaily.com.cn
          主站蜘蛛池模板: 国产老熟女视频一区二区| 18禁无遮挡啪啪无码网站| 又粗又硬又大又猛免费视频| 韩国美女av一区二区三区四区| 久久国产精品一国产精品金尊| 夜夜添无码试看一区二区三区| 一本一道av无码中文字幕麻豆| 亚洲精品有码在线观看| 色欲狠狠躁天天躁无码中文字幕| 欧美成人午夜在线观看视频| 精品深夜av无码一区二区老年| 国产精品白浆免费视频| 欧美成人性色一区欧美成人性色区 | 无码人妻精品一区二区三区蜜桃| 久久亚洲私人国产精品| 97午夜理论电影影院| 中文在线8资源库| 九九热精品免费在线视频| 色婷婷亚洲综合五月| 国产精品一区二区三区色| 69精品丰满人妻无码视频a片| 精品乱码一区二区三四五区| 色九月亚洲综合网| 2021久久精品国产99国产| 免费无码成人AV片在线| 色综合天天综合| 亚洲精品中文字幕一区二| 久久国产色av免费看| 国产精品会所一区二区三区| 国产精品无码无卡在线播放| 国产亚洲久久久久久久| 人人妻人人澡人人爽欧美一区双 | 国产精品女生自拍第一区| 99久久er热在这里只有精品99| 国产免费无遮挡吸奶头视频| 成人污视频| 在线A毛片免费视频观看| 粉嫩大学生无套内射无码卡视频| 国产精品视频中文字幕| 最近国语高清免费观看视频 | 国产精品高清视亚洲中文|