<tt id="6hsgl"><pre id="6hsgl"><pre id="6hsgl"></pre></pre></tt>
          <nav id="6hsgl"><th id="6hsgl"></th></nav>
          国产免费网站看v片元遮挡,一亚洲一区二区中文字幕,波多野结衣一区二区免费视频,天天色综网,久久综合给合久久狠狠狠,男人的天堂av一二三区,午夜福利看片在线观看,亚洲中文字幕在线无码一区二区
                   |Home|About Hebei|Government|Business|Opening up|Travel|Culture| Site Search 中文
          Integrated development projects in Hebei call for bids
          2010-07-26

          43. Fuyang River Main City Section River Bank Aisle Comprehensive Development Project in Handan City

          Ⅰ. The Project Content

          The project is to the north of Nanhu Park and to the south of Menghu Lake senic apot. The area is 16 kilometers long, and covers the land area of 15 square kilometers. Take the advantages of the unique and superior water envirenment and green space corridor of Fuyang River, the project is planned to explore the deep historical and cultural details of Fuyang River and pump new development idea, to establish elaborate river bank aisle. Along the river eight gates, nine gardens and twenty eight bridges will be constructed as infrastructural facilities. While building 3 zones (River Bank Sightseeing Zone, Business Leisure Pedestrian Zone, and Ecologic Experience Tourism Zone) and 3 centers (Centeral River Bank Leisure Business Area, Hanshan Cultural Leisure Business Area and Congtai Tourism Leisure Business Area), the project is planed to build a city sightseeing zone with multifunction for tourism, laisure, amusement, business, and residence. This project enjoys urban redevelopment preferential policy and key project supporting preferential policy of Handan government.

          Ⅱ. Investment Estimate

          The total investment is 3216.37 million dollars.

          III. Construction Conditions

          The river bank area is the golden district of the city. There are abundant labour power, material and capital in the area. Old town and villages in the city of the area are under reconstruction plan, and part of the reconstruction has already started. All the factories in the area is under the" suppress the second industry and develop the third industry " project of Handan City. Some of the factories have begun to move out. Treatment of watercourse is mostly finished. Preliminary plan and design of the project is completed. The infrastructural facilities around the area including roads, water sulppy, electric supply and system of drains are all in readiness.

          VI.Cooperation Mode

          Cooperation, joint venture and Sole venture are all welcomed.

          V.Liaison

          Contact Person: Zhao Jianbin, Handan Construction Bureau Tel:86-310-3122916,3122944 Fax:86-310-3022329 Email:zjb@hdjsj.hd.gov.cn Address:No.2 South Exhibition Road Handan City P.C.056002

          44. Hedong Village Reconstruction Project in Handan City

          Ⅰ. The Project Content

          The village is in the range of the reconstruction project of the 55 villages in the city within the ring road. There are 3800 residents, 927 households in the area. The planned land area is 500 Mu. In 2010 Handan government takes Hedong village into reconstruction list, and offers favorable policies. The construction will be implemented according to The Implementation instruction on accelerating the old town and inner-city village reconstruction in the main city ([2009] No. 39) of the municipal government. Land grand fee will follow a policy of"separating revenue from expenditures", and the land price and deed tax can be paid in three times within three months, after deducting related fees, will be returned charged to property owner by the finance charge as the removal and rebuilding resettlement compensation. At the same time the project exempt from government funding and administrative fees such as land management fees, urban infrastructure supporting fees, house ownership registration fees, urban road occupation excavation costs and special funds of new wall materials etc.; Exempt from construction waste and sediment handling fees; for the construction of civil air defense according to the provisions the basement of ex-situ construction costs is free, due to geology, terrain and planning reasons not to build air-defense basement, remit half of the civil air defense construction fee; for the transfer condition that allocated by the municipal government to build low-rent housing at cost price of the acquisition is no longer to extract the low-rent housing security funds.

          Ⅱ. Investment Estimate and Financing

          The total investment is 58.48 million dollars. No limitation for proportion of foreign tradesman investment.

          III. Market Analysis

          Current price of the Handan City real estate market is steady and rising. Commercial residecial house sale is promising, with strong market potential.

          VI.Construction Conditions

          The village is located in the city center within the ring road. The transportation is convenient, and infrastructure and supporting facilities are completed.

          V.Benefit Analysis

          The village is located in central area within the ring road. Through the comprehensive development of real estate, the project enjoys the preferential policies. There is great development space for profit margins.

          VI.Cooperation Mode

          Cooperation, joint venture and sole venture, by developing to promote the construction.

          VII.Liaison

          Contact Person: Zhai Yongsheng, Handan Construction Bureau Address:No.2 South Exhibition Road Handan City P.C.056002 Tel:86-310-3100126,3100121 Fax:86-310-3022329

          45. Hexi Village Reconstruction Project in Handan City

          Ⅰ. The Project Content

          The village is in the range of the reconstruction project of the 55 inner city villages within the ring road. There are 3100 residents belong to 840 households in the area. The planned land area is 318mu. In 2010 Handan government takes Hedong village into reconstruction list, and offers favorable policies. The construction will be implemented according to The Implementation instruction on accelerating the old town and inner-city village reconstruction in the main city ([2009] No. 39) of the municipal government. Land grand fee will follow a policy of"separating revenue from expenditures", and the land price and deed tax can be paid in three times within three months, after deducting related fees, will be returned charged to property owner by the finance charge as the removal and rebuilding resettlement compensation. At the same time the project exempt from government funding and administrative fees such as land management fees, urban infrastructure supporting fees, house ownership registration fees, urban road occupation excavation costs and special funds of new wall materials etc.; Exempt from construction waste and sediment handling fees; for the construction of civil air defense according to the provisions the basement of ex-situ construction costs is free, due to geology, terrain and planning reasons not to build air-defense basement, remit half of the civil air defense construction fee; for the transfer condition that allocated by the municipal government to build low-rent housing at cost price of the acquisition is no longer to extract the low-rent housing security funds.

          Ⅱ. Investment Estimate and Financing

          The total investment is 58.48 million dollars. No limitation for proportion of foreign tradesman investment.

           III. Market Analysis

          Current price of the Handan City real estate market is steady and rising. Commercial residecial house sale is promising, with strong market potential.

          VI.Construction Conditions

          The village is located in the city center within the ring road. The transportation is convenient, and infrastructure and supporting facilities are completed.

          V.Benefit Analysis

          The village is located in central area within the ring road. Through the comprehensive development of real estate, the project enjoys the preferential policies. There is great development space for profit margins.

          VI.Cooperation Mode

          Cooperation, joint venture and sole venture, by developing to promote the construction.

          VII.Liaison

          Contact Person: Zhai Yongsheng, Handan Construction Bureau Address:No.2 South Exhibition Road Handan City P.C.056002 Tel:86-310-3100126,3100121 Fax:86-310-3022329





           
          About Hebei  
          More
          Opening Up  
          More
          Culture  
          More
          Hot Topics  
          More
          Info   Special

          Zhongmao Haiyue Hotel
           
          Copyright 2009 Hebei China All Rights Reserved
           
          The Official Website of the Hebei Government
          Sponsored by Hebei Provincial Government
          Constructed by Chinadaily.com.cn
          主站蜘蛛池模板: 99精品国产一区二区三区| 亚洲精品麻豆一二三区| 亚洲成在人线在线播放无码| 亚洲AV永久无码精品秋霞电影影院 | yy111111在线尤物| gogogo高清在线播放免费| 中文无码热在线视频| 沈阳45老熟女高潮喷水亮点| 中文字幕亚洲综合久久蜜桃| 国产丝袜啪啪| 国产女人水多毛片18| 久久精品夜夜夜夜夜久久| 亚洲一本大道在线| 悠悠人体艺术视频在线播放| 亚洲av无码之国产精品网址蜜芽 | 亚洲av日韩av永久无码电影| 国产一区二区三区小说| 日本视频一两二两三区| 图片区小说区亚洲欧美自拍| 诱人的岳hd中文字幕| 黄页网址大全免费观看| 国产精品不卡一区二区久久| 综合色一色综合久久网| 亚洲人成影院在线观看| 中文国产成人精品久久不卡| 亚洲 校园 欧美 国产 另类| 欧美性xxxxx极品| 视频网站在线观看不卡| 亚洲精品美女一区二区| 亚洲AV无码久久精品日韩| 丝袜美腿诱惑之亚洲综合网| 黑森林福利视频导航| 免费观看欧美猛交视频黑人| 国产永久免费高清在线观看| 欧美一本大道香蕉综合视频| 欧美日本中文| 成人av在线播放不卡| 久久亚洲av成人无码国产| 欧美成年黄网站色视频| 韩国午夜理伦三级| 五月开心六月丁香综合色啪|